Multi-Layer Gantt Chart
Source Code Listing
#include "chartdir.h"
int main(int argc, char *argv[])
{
// the names of the tasks
const char* labels[] = {"Market Research", "Define Specifications", "Overall Archiecture",
"Project Planning", "Detail Design", "Software Development", "Test Plan", "Testing and QA",
"User Documentation"};
const int labels_size = (int)(sizeof(labels)/sizeof(*labels));
// the planned start dates and end dates for the tasks
double startDate[] = {Chart::chartTime(2004, 8, 16), Chart::chartTime(2004, 8, 30),
Chart::chartTime(2004, 9, 13), Chart::chartTime(2004, 9, 20), Chart::chartTime(2004, 9, 27),
Chart::chartTime(2004, 10, 4), Chart::chartTime(2004, 10, 25), Chart::chartTime(2004, 11, 1
), Chart::chartTime(2004, 11, 8)};
const int startDate_size = (int)(sizeof(startDate)/sizeof(*startDate));
double endDate[] = {Chart::chartTime(2004, 8, 30), Chart::chartTime(2004, 9, 13),
Chart::chartTime(2004, 9, 27), Chart::chartTime(2004, 10, 4), Chart::chartTime(2004, 10, 11
), Chart::chartTime(2004, 11, 8), Chart::chartTime(2004, 11, 8), Chart::chartTime(2004, 11,
22), Chart::chartTime(2004, 11, 22)};
const int endDate_size = (int)(sizeof(endDate)/sizeof(*endDate));
// the actual start dates and end dates for the tasks up to now
double actualStartDate[] = {Chart::chartTime(2004, 8, 16), Chart::chartTime(2004, 8, 27),
Chart::chartTime(2004, 9, 9), Chart::chartTime(2004, 9, 18), Chart::chartTime(2004, 9, 22)};
const int actualStartDate_size = (int)(sizeof(actualStartDate)/sizeof(*actualStartDate));
double actualEndDate[] = {Chart::chartTime(2004, 8, 27), Chart::chartTime(2004, 9, 9),
Chart::chartTime(2004, 9, 27), Chart::chartTime(2004, 10, 2), Chart::chartTime(2004, 10, 8)}
;
const int actualEndDate_size = (int)(sizeof(actualEndDate)/sizeof(*actualEndDate));
// Create a XYChart object of size 620 x 280 pixels. Set background color to light green
// (ccffcc) with 1 pixel 3D border effect.
XYChart* c = new XYChart(620, 280, 0xccffcc, 0x000000, 1);
// Add a title to the chart using 15 points Times Bold Itatic font, with white (ffffff) text on
// a dark green (0x6000) background
c->addTitle("Multi-Layer Gantt Chart Demo", "Times New Roman Bold Italic", 15, 0xffffff
)->setBackground(0x006000);
// Set the plotarea at (140, 55) and of size 460 x 200 pixels. Use alternative white/grey
// background. Enable both horizontal and vertical grids by setting their colors to grey
// (c0c0c0). Set vertical major grid (represents month boundaries) 2 pixels in width
c->setPlotArea(140, 55, 460, 200, 0xffffff, 0xeeeeee, Chart::LineColor, 0xc0c0c0, 0xc0c0c0
)->setGridWidth(2, 1, 1, 1);
// swap the x and y axes to create a horziontal box-whisker chart
c->swapXY();
// Set the y-axis scale to be date scale from Aug 16, 2004 to Nov 22, 2004, with ticks every 7
// days (1 week)
c->yAxis()->setDateScale(Chart::chartTime(2004, 8, 16), Chart::chartTime(2004, 11, 22), 86400 *
7);
// Add a red (ff0000) dash line to represent the current day
c->yAxis()->addMark(Chart::chartTime(2004, 10, 8), c->dashLineColor(0xff0000, Chart::DashLine));
// Set multi-style axis label formatting. Month labels are in Arial Bold font in "mmm d" format.
// Weekly labels just show the day of month and use minor tick (by using '-' as first character
// of format string).
c->yAxis()->setMultiFormat(Chart::StartOfMonthFilter(), "<*font=Arial Bold*>{value|mmm d}",
Chart::StartOfDayFilter(), "-{value|d}");
// Set the y-axis to shown on the top (right + swapXY = top)
c->setYAxisOnRight();
// Set the labels on the x axis
c->xAxis()->setLabels(StringArray(labels, labels_size));
// Reverse the x-axis scale so that it points downwards.
c->xAxis()->setReverse();
// Set the horizontal ticks and grid lines to be between the bars
c->xAxis()->setTickOffset(0.5);
// Use blue (0000aa) as the color for the planned schedule
int plannedColor = 0x0000aa;
// Use a red hash pattern as the color for the actual dates. The pattern is created as a 4 x 4
// bitmap defined in memory as an array of colors.
int hashPattern[] = {0xffffff, 0xffffff, 0xffffff, 0xff0000, 0xffffff, 0xffffff, 0xff0000,
0xffffff, 0xffffff, 0xff0000, 0xffffff, 0xffffff, 0xff0000, 0xffffff, 0xffffff, 0xffffff};
const int hashPattern_size = (int)(sizeof(hashPattern)/sizeof(*hashPattern));
int actualColor = c->patternColor(IntArray(hashPattern, hashPattern_size), 4);
// Add a box whisker layer to represent the actual dates. We add the actual dates layer first,
// so it will be the top layer.
BoxWhiskerLayer* actualLayer = c->addBoxLayer(DoubleArray(actualStartDate, actualStartDate_size
), DoubleArray(actualEndDate, actualEndDate_size), actualColor, "Actual");
// Set the bar height to 8 pixels so they will not block the bottom bar
actualLayer->setDataWidth(8);
// Add a box-whisker layer to represent the planned schedule date
c->addBoxLayer(DoubleArray(startDate, startDate_size), DoubleArray(endDate, endDate_size),
plannedColor, "Planned")->setBorderColor(Chart::SameAsMainColor);
// Add a legend box on the top right corner (595, 60) of the plot area with 8 pt Arial Bold
// font. Use a semi-transparent grey (80808080) background.
LegendBox* b = c->addLegend(595, 60, false, "Arial Bold", 8);
b->setAlignment(Chart::TopRight);
b->setBackground(0x80808080, -1, 2);
// Output the chart
c->makeChart("layergantt.png");
//free up resources
delete c;
return 0;
}