ChartDirector 7.1 (C++ Edition)

PyramidLayer.setLayerGap


Usage

void setLayerGap(double layerGap);

Description

Sets the gap between this pyramid layer and the next pyramid layer.

To apply this method to all pyramid layers, use PyramidChart.setLayerGap.

Arguments

ArgumentDefaultDescription
layerGap(Mandatory)The gap between layers as a ratio to the height of the pyramid. The gap must be greater than or equals 0. The sum of all gaps must be less than 1.

Return Value

None