<cfscript>
// ChartDirector for ColdFusion API Access Point
cd = CreateObject("java", "ChartDirector.CFChart");
// A utility to allow us to create arrays with data in one line of code
function Array() {
var result = ArrayNew(1);
var i = 0;
for (i = 1; i LTE ArrayLen(arguments); i = i + 1)
result[i] = arguments[i];
return result;
}
// The tasks for the gantt chart
labels = Array("Market Research", "Define Specifications", "Overall Archiecture",
"Project Planning", "Detail Design", "Software Development", "Test Plan", "Testing and QA",
"User Documentation");
// The task index, start date, end date and color for each bar
taskNo = Array(0, 0, 1, 2, 3, 4, 5, 6, 6, 7, 8, 8);
startDate = Array(CreateDate(2004, 8, 16), CreateDate(2004, 10, 4), CreateDate(2004, 8, 30),
CreateDate(2004, 9, 13), CreateDate(2004, 9, 20), CreateDate(2004, 9, 27), CreateDate(2004, 10,
4), CreateDate(2004, 10, 4), CreateDate(2004, 10, 25), CreateDate(2004, 11, 1), CreateDate(2004,
10, 18), CreateDate(2004, 11, 8));
endDate = Array(CreateDate(2004, 8, 30), CreateDate(2004, 10, 18), CreateDate(2004, 9, 13),
CreateDate(2004, 9, 27), CreateDate(2004, 10, 4), CreateDate(2004, 10, 11), CreateDate(2004, 11,
8), CreateDate(2004, 10, 18), CreateDate(2004, 11, 8), CreateDate(2004, 11, 22), CreateDate(
2004, 11, 1), CreateDate(2004, 11, 22));
colors = Array("0x00cc00", "0x00cc00", "0x00cc00", "0x0000cc", "0x0000cc", "0xcc0000", "0xcc0000",
"0x0000cc", "0xcc0000", "0xcc0000", "0x00cc00", "0xcc0000");
// Create a XYChart object of size 620 x 325 pixels. Set background color to light red (0xffcccc),
// with 1 pixel 3D border effect.
c = cd.XYChart(620, 325, "0xffcccc", "0x000000", 1);
// Add a title to the chart using 15 points Times Bold Itatic font, with white (ffffff) text on a
// dark red (800000) background
c.addTitle("Mutli-Color Gantt Chart Demo", "Times New Roman Bold Italic", 15, "0xffffff"
).setBackground("0x800000");
// Set the plotarea at (140, 55) and of size 460 x 200 pixels. Use alternative white/grey
// background. Enable both horizontal and vertical grids by setting their colors to grey (c0c0c0).
// Set vertical major grid (represents month boundaries) 2 pixels in width
c.setPlotArea(140, 55, 460, 200, "0xffffff", "0xeeeeee", cd.LineColor, "0xc0c0c0", "0xc0c0c0"
).setGridWidth(2, 1, 1, 1);
// swap the x and y axes to create a horziontal box-whisker chart
c.swapXY();
// Set the y-axis scale to be date scale from Aug 16, 2004 to Nov 22, 2004, with ticks every 7 days
// (1 week)
c.yAxis().setDateScale(CreateDate(2004, 8, 16), CreateDate(2004, 11, 22), 86400 * 7);
// Set multi-style axis label formatting. Month labels are in Arial Bold font in "mmm d" format.
// Weekly labels just show the day of month and use minor tick (by using '-' as first character of
// format string).
c.yAxis().setMultiFormat(cd.StartOfMonthFilter(), "<*font=Arial Bold*>{value|mmm d}",
cd.StartOfDayFilter(), "-{value|d}");
// Set the y-axis to shown on the top (right + swapXY = top)
c.setYAxisOnRight();
// Set the labels on the x axis
c.xAxis().setLabels(labels);
// Reverse the x-axis scale so that it points downwards.
c.xAxis().setReverse();
// Set the horizontal ticks and grid lines to be between the bars
c.xAxis().setTickOffset(0.5);
// Add some symbols to the chart to represent milestones. The symbols are added using scatter
// layers. We need to specify the task index, date, name, symbol shape, size and color.
c.addScatterLayer(Array(1), Array(CreateDate(2004, 9, 13)), "Milestone 1", cd.Cross2Shape(), 13,
"0xffff00").setHTMLImageMap("{disable}");
c.addScatterLayer(Array(3), Array(CreateDate(2004, 10, 4)), "Milestone 2", cd.StarShape(5), 15,
"0xff00ff").setHTMLImageMap("{disable}");
c.addScatterLayer(Array(5), Array(CreateDate(2004, 11, 8)), "Milestone 3", cd.TriangleSymbol, 13,
"0xff9933").setHTMLImageMap("{disable}");
// Add a multi-color box-whisker layer to represent the gantt bars
layer = c.addBoxWhiskerLayer2(startDate, endDate, ArrayNew(1), ArrayNew(1), ArrayNew(1), colors);
layer.setXData(taskNo);
layer.setBorderColor(cd.SameAsMainColor);
// Divide the plot area height ( = 200 in this chart) by the number of tasks to get the height of
// each slot. Use 80% of that as the bar height.
layer.setDataWidth(Int(200 * 4 / 5 / ArrayLen(labels)));
// Add a legend box at (140, 265) - bottom of the plot area. Use 8pt Arial Bold as the font with
// auto-grid layout. Set the width to the same width as the plot area. Set the backgorund to grey
// (dddddd).
legendBox = c.addLegend2(140, 265, cd.AutoGrid, "Arial Bold", 8);
legendBox.setWidth(461);
legendBox.setBackground("0xdddddd");
// The keys for the scatter layers (milestone symbols) will automatically be added to the legend
// box. We just need to add keys to show the meanings of the bar colors.
legendBox.addKey("Market Team", "0x00cc00");
legendBox.addKey("Planning Team", "0x0000cc");
legendBox.addKey("Development Team", "0xcc0000");
// Output the chart
chart1URL = c.makeSession(GetPageContext(), "chart1");
// Include tool tip for the chart
imageMap1 = c.getHTMLImageMap("", "",
"title='{xLabel}: {top|mmm dd, yyyy} to {bottom|mmm dd, yyyy}'");
</cfscript>
<html>
<body style="margin:5px 0px 0px 5px">
<div style="font-size:18pt; font-family:verdana; font-weight:bold">
Multi-Color Gantt Chart
</div>
<hr style="border:solid 1px #000080" />
<cfoutput>
<div style="font-size:9pt; font-family:verdana; margin-bottom:1.5em">
<a href='viewsource.cfm?file=#CGI.SCRIPT_NAME#'>View Source Code</a>
</div>
<img src="getchart.cfm?#chart1URL#" usemap="##map1" border="0" />
<map name="map1">#imageMap1#</map>
</cfoutput>
</body>
</html> |